Utilize CoalitionBeyond Peak: Defining, Measuring, and Optimizing Grid UtilizationPaper
A Utilize Coalition white paper by Noah Goldmann and Molly Knoll on measuring how fully the grid is used.
Arushi’s role: External reviewer / peer reviewer
Read
Global Capacity AllianceTelemetry Offsetting Technical Architecture – ERCOT White PaperPaper
V-Wire’s draft architecture for the Global Capacity Alliance: crediting a paired battery or generator to a flexible load’s curtailment in ERCOT.
Arushi’s role: Cited in the paper
ReadEssay
Introduces EAAST, the framework that ties Luminary’s ventures into one circle of electron arbitrage across space and time.
Read
Aurora Energy ResearchCurtailment Mitigation for PCLRs: Modeling the Effects of Front-of-Meter NettingPaper
Aurora Energy Research models how front-of-meter netting could cut curtailment for data centers on ERCOT’s PCLR pathway.
Arushi’s role: Cited in the report
Read
Luminary StrategiesEmeraldAI on AI Data Centers: Bring Your Common Sense With YouEssay
Why a “good grid citizen” framework for AI data centers matches the principles behind Luminary’s investments.
ReadEssay
How forests shaped the thinking behind PCLR: build deep common roots, then let competition decide what grows.
ReadPaper
The first Prosperous Infrastructure paper explains how ERCOT’s PCLR makes AI loads visible, dispatchable grid resources.
ReadEssay
Why data center “flexibility” is really two products: a firm floor from the grid, and private firming above it.
Read
Earthshot FoundationFrom Rivals in Gridlock to Champions of a Stronger, Smarter GridPaper
The Earthshot Foundation’s synthesis of a year of GridIron dialogue among more than 200 grid practitioners.
Arushi’s role: Contributor and peer reviewer
Read
C3 JournalA Consumer-First Grid: How Texas is Privatizing Transmission Delivery Risk to Win the AI CenturyArticle
Why letting large energy users carry transmission delivery risk could get them connected to power sooner.
Read
Luminary StrategiesThe Texas Earthshot for AI LoadsEssay
Marks unanimous ERCOT committee approval for PCLR — in her words, concept to voted-on reality in ten months.
Read
Luminary StrategiesFlexible Loads in ERCOT = Provisional CLRsEssay
Explains how Provisional CLRs would bring “connect and manage” to Texas AI loads awaiting firm grid capacity.
Read
CSISThe Texas Energy Reference Design: Stress-Testing Load Growth Challenges for an AI CenturyCommentary
How Texas is taking on reliability, cost and speed at once as AI demand pours onto its grid.
Read
CSISExploring the New Math Puzzle of a PJM InterventionCommentary
What the White House’s principles for PJM could mean for prices, reliability and the companies building for AI.
Read
Luminary StrategiesAI, data centers, and your billEssay
Why rising wholesale prices near data centers don’t automatically mean higher retail bills, and what does.
Read
Utility DiveAggregations and data centers: If a resource shows up when the grid is straining, make it count.Op-ed
Applies the lessons that earned DERs a place on the grid to AI data centers, in six policy moves.
Read
CSISFrom Bottlenecks to Breakthroughs: Rewriting the Grid Planning Playbook in the Southwest Power Pool and TexasCommentary
Why AI campuses shouldn’t be planned like steel mills, and how SPP and ERCOT could bring them online faster.
Read
Latitude MediaAI requires a smarter grid — and so does everyone elseOp-ed
Why the grid flexibility built for AI must also protect households, or we risk two energy systems.
Read
CSISPower Access for AI: The Flexibility CompactCommentary
A proposed deal: faster grid access for data centers that can prove they flex when the grid is stressed.
Read
CSISExperts React: Energy Policy in the Reconciliation DebateCommentary
Seven CSIS experts on the May 2025 House reconciliation bills. Arushi writes on the cost of capital and supply chains.
Arushi’s role: Contributing author
Read